School sector Reform Program (SSRP)

Funding Information
(USD)
Total Actual Commitment:
978,440,627 USD
Total Planned Commitment:
0 USD
Total Actual Disbursements:
891,822,185 USD
Total Planned Disbursements:
332,830,548 USD
Unallocated Disbursements:
86,618,443 USD
TOTAL EXPENDITURES:
10,267,032 USD USD
Additional Information
Project Created By:
bpradhan@mof.gov.np
Project Modified By:
atl@mof.gov.np
Project Created On:
10/19/2021
Created in workspace:
IECCD Workspace -Team
 
Identification
Project Title: 
School sector Reform Program (SSRP) VALIDATED
ID: 
8723883742

IATI Identifier: 


Gender Marker: 
Neutral

Climate Change Relevance: 
Neutral

Status:  On-Going
Budget Head:  350105 350121 350803 
Status Reason: 

 


Input: 
  • Basic Education
  • Secondary Education
  • Institutional Capacity Strengthening

Outputs: 

To ensure equitable access to quality basic education for all children in 5-12 age group.

To improve the access, equity, quality and relevance of secondary education.

To enhance functional literacy and basic competencies among youths and adults.

To equip secondary level students with TVET soft skills.

To enhance teachers' qualifications and professional competencies to better facilitate students learning processes.

To improve the performance of the MOE service delivery system and develop the capacity to implement critical reforms.

To monitor programme inputs, processes, and outputs and evaluate the impact of the Plan.

To improve the efficiency and effectiveness of aid available for SSRP implementation

The program runs from 2009-10 to 2013-14. Total budget is USD 2626.01 million, out of which donors provide USD 624.99 million (23.8%).


Outcome:

To provide opportunity to all Nepali citizens to become functionally literate, numerate, and develop the basic life skills, vocational skills and knowledge required to enjoy a productive life. Major objective is to increase access to and improve quality of school education, particularly of basic education, especially for children and youths from marginalized groups.


Impact: 

To contribute to Nepal’s socio-economic development through a continuous development of its human resources capacity.



Budget Type:
On Budget

Treasury Type:


Humanitarian Aid: No

Planning

Date of Agreement:  01-27-2009
Date of effectiveness:  01-23-2009
Proposed Start Date:  01-01-2010
Actual Start Date:  01-01-2010
Planned Completion Date:  01-31-2014
Location
[Bagmati] [Bhaktapur (Bhaktapur)] 1.0%

[Bagmati] [Dhading (Dhading Besi)] 1.0%

[Bagmati] [Kathmandu (Kathmandu)] 1.0%

[Bagmati] [Kavrepalanchok (Dhulikhel)] 1.0%

[Bagmati] [Lalitpur (Patan)] 1.0%

[Bagmati] [Nuwakot (Bidur)] 1.0%

[Bagmati] [Rasuwa (Dhunche)] 2.0%

[Bagmati] [Sindhupalchok (Chautara)] 1.0%

[Janakpur] [Dhanusa (Janakpur)] 1.0%

[Janakpur] [Dholkha (Charikot)] 1.0%

[Sagarmatha ] [Siraha (Siraha)] 1.0%

[Lumbini ] [Rupandehi (Bhairahawa)] 2.0%

[Janakpur] [Mahottari (Jaleswor)] 2.0%

[Janakpur] [Ramechhap (Manthali)] 2.0%

[Janakpur] [Sarlahi (Malangwa)] 1.0%

[Janakpur] [Sindhuli (Sindhuli Madhi)] 1.0%

[ Narayani ] [Bara (Kalaiya)] 2.0%

[ Narayani ] [Chitwan (Bharatpur)] 1.0%

[ Narayani ] [Makwanpur (Hetauda)] 1.0%

[ Narayani ] [Parsa (Birgunj)] 2.0%

[ Narayani ] [Rautahat (Gaur)] 1.0%

[Koshi ] [Bhojpur (Bhojpur)] 2.0%

[Koshi ] [Dhankuta (Dhankuta)] 1.0%

[Koshi ] [Morang (Biratnagar)] 1.0%

[Koshi ] [Sankhuwasabha (Khandbari)] 2.0%

[Koshi ] [Sunsari (Inaruwa)] 2.0%

[Koshi ] [Terhathum (Manglung)] 1.0%

[Mechi ] [Ilam (Ilam)] 1.0%

[Mechi ] [Jhapa (Chandragadhi)] 2.0%

[Mechi ] [Panchthar (Phidim)] 2.0%

[Mechi ] [Taplejung (Taplejung)] 2.0%

[Sagarmatha ] [Khotang (Diktel)] 1.0%

[Sagarmatha ] [Okhaldhunga (Okhaldhunga)] 1.0%

[Sagarmatha ] [Saptari (Rajbiraj)] 1.0%

[Sagarmatha ] [Solukhumbu (Salleri)] 1.0%

[Sagarmatha ] [Udayapur (Gaighat)] 2.0%

[Mahakali ] [Baitadi (Baitadi)] 1.0%

[Mahakali ] [Dadeldhura (Dadeldhura)] 1.0%

[Mahakali ] [Darchula (Darchula)] 2.0%

[Mahakali ] [Kanchanpur (Mahendara Nagar)] 2.0%

[Seti ] [Achham (Mangalsen)] 1.0%

[Seti ] [Bajhang (Chainpur)] 1.0%

[Seti ] [Bajura (Martadi)] 2.0%

[Seti ] [Doti (Dipayal)] 1.0%

[Seti ] [Kailali (Dhangadhi)] 1.0%

[Bheri] [Banke (Nepalgunj)] 1.0%

[Bheri] [Bardiya (Gulariya)] 1.0%

[Bheri] [Dailekh (Dullu)] 1.0%

[Bheri] [Surkhet (Surkhet)] 1.0%

[ Karnali ] [Dolpa (Dolpa)] 2.0%

[ Karnali ] [Humla (Simikot)] 2.0%

[ Karnali ] [Jumla (Jumla Khalanga)] 1.0%

[ Karnali ] [Kalikot (Kalikot)] 1.0%

[ Karnali ] [Mugu (Gamgadhi)] 1.0%

[Rapti ] [Dang Deukhuri (Ghorahi)] 1.0%

[Rapti ] [Pyuthan (Pyuthan Khalanga)] 2.0%

[Rapti ] [Rolpa (Liwang)] 1.0%

[Rapti ] [Rukum (Musikot)] 1.0%

[Rapti ] [Salyan (Salyan Khalanga)] 1.0%

[Dhawalagiri] [Baglung (Baglung)] 1.0%

[Dhawalagiri] [Mustang (Jomsom)] 1.0%

[Dhawalagiri] [Myagdi (Beni)] 2.0%

[Dhawalagiri] [Parbat (Kusma)] 2.0%

[Gandaki] [Gorkha (Gorkha)] 1.0%

[Gandaki] [Kaski (Pokhara)] 1.0%

[Gandaki] [Lamjung (Bensi Sahar)] 2.0%

[Gandaki] [Manang (Chame)] 1.0%

[Gandaki] [Syangja (Syangja)] 1.0%

[Gandaki] [Tanahu (Damauli)] 2.0%

[Lumbini ] [Arghakhanchi (Sandhikharka)] 1.0%

[Lumbini ] [Gulmi (Tamghas)] 2.0%

[Lumbini ] [Kapilvastu (Taulihawa)] 1.0%

[Lumbini ] [Nawalparasi (Parasi)] 1.0%

[Lumbini ] [Palpa (Tansen)] 1.0%

[Bheri] [Jajarkot (Khalanga)] 2.0%

X

Map

Show Map
National Plan
[National Development Plan (NDP)]   [Social Development Policy]   [Education] 100.0%
Sectors

PRIMARY SECTORS
Nepal Sector Classification - EDUCATION (100.0)%


Implementing/Executing Agencies

Donor Organization: 
  • Private Citizen
  • Finland
  • European Union
  • World Bank Trust Funds
  • Department for International Development
  • Global Partnership for Education
  • Government of Australia
  • Asian Development Bank
  • International Development Association
  • Denmark
  • Japan International Cooperation Agency
  • Norway
  • United Nations Children's Fund

Counterpart Ministry : 
  • Ministry of Education, Science and Technology 100.0 %

Executing Agency: 
  • Department of Education 100.0 %

Implementing Agency: 
  • Department of Education 100.0 %
Funding
GON Fund
Location Transaction Date Amount
Federal NPR
Benificary Fund
Location Transaction Date Amount
Federal NPR
Private Citizen
Transaction Type Transaction Date Type Of Assistance Mode Of Payment Post Earthquake Assistance Aid Type Financing Instrument Amount
Actual Commitment 02-28-2011 Grant Aid Cash No NORMAL CASE Sector Wide Approach 2,059,025 USD
Sub Total Actual Commitment: 2,059,025 USD
Sub Total Planned Commitment: 0 USD
Sub Total Actual Disbursement: 0 USD
Sub Total Planned Disbursement: 0 USD
UNDISBURSED BALANCE: 2,059,025 USD
European Union
Transaction Type Transaction Date Type Of Assistance Mode Of Payment Post Earthquake Assistance Aid Type Financing Instrument Amount
Actual Commitment 06-05-2008 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 37,825,059 USD
Actual Commitment 06-15-2010 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 26,000,000 USD
Actual Commitment 06-16-2010 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 26,000,000 USD
Actual Commitment 06-22-2010 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 32,027,593 USD
Actual Commitment 11-30-2012 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 43,500,844 USD
Actual Commitment 11-10-2013 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 42,234,697 USD
Actual Commitment 11-10-2013 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 42,234,697 USD
Sub Total Actual Commitment: 249,822,889 USD
Sub Total Planned Commitment: 0 USD
Actual Disbursement 07-15-2008 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 15,390,014 USD
Actual Disbursement 07-15-2009 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 12,677,842 USD
Actual Disbursement 11-30-2010 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 21,016,682 USD
Actual Disbursement 12-31-2011 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 5,379,960 USD
Actual Disbursement 12-31-2011 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 5,716,207 USD
Actual Disbursement 03-31-2012 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 14,674,493 USD
Actual Disbursement 11-08-2013 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 3,018,109 USD
Actual Disbursement 03-19-2014 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 2,089,427 USD
Actual Disbursement 07-18-2014 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 2,704,164 USD
Actual Disbursement 04-24-2015 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 76,635 USD
Actual Disbursement 05-07-2015 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 2,261,000 USD
Actual Disbursement 04-27-2016 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 53,678 USD
Actual Disbursement 07-02-2018 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 22,260,834 USD
Sub Total Actual Disbursement: 107,319,046 USD
Planned Disbursement 09-30-2011 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 5,429,619 USD
Planned Disbursement 09-30-2011 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 5,768,970 USD
Planned Disbursement 09-30-2012 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 4,821,291 USD
Planned Disbursement 09-30-2013 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 2,672,368 USD
Planned Disbursement 11-08-2013 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 3,018,109 USD
Planned Disbursement 03-19-2014 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 2,089,427 USD
Planned Disbursement 03-31-2014 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 15,126,513 USD
Planned Disbursement 03-31-2015 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 13,247,300 USD
Sub Total Planned Disbursement: 52,173,596 USD
UNDISBURSED BALANCE: 142,503,844 USD
Norway
Transaction Type Transaction Date Type Of Assistance Mode Of Payment Post Earthquake Assistance Aid Type Financing Instrument Amount
Actual Commitment 08-06-2012 Grant Aid Cash No NORMAL CASE Sector Wide Approach 36,635,552 USD
Actual Commitment 12-05-2014 Grant Aid Cash No NORMAL CASE Sector Wide Approach 18,745,404 USD
Sub Total Actual Commitment: 55,380,956 USD
Sub Total Planned Commitment: 0 USD
Actual Disbursement 12-17-2009 Grant Aid Cash No NORMAL CASE Sector Wide Approach 8,430,773 USD
Actual Disbursement 11-18-2010 Grant Aid Cash No NORMAL CASE Sector Wide Approach 8,071,299 USD
Actual Disbursement 12-09-2011 Grant Aid Cash No NORMAL CASE Sector Wide Approach 8,788,558 USD
Actual Disbursement 12-03-2012 Grant Aid Cash No NORMAL CASE Sector Wide Approach 7,031,852 USD
Actual Disbursement 12-17-2012 Grant Aid Cash No NORMAL CASE Sector Wide Approach 3,109,453 USD
Actual Disbursement 08-23-2013 Grant Aid Cash No NORMAL CASE Sector Wide Approach -3,873 USD
Actual Disbursement 12-09-2013 Grant Aid Cash No NORMAL CASE Sector Wide Approach 2,066,873 USD
Actual Disbursement 09-19-2014 Grant Aid Cash No NORMAL CASE Sector Wide Approach -2,322 USD
Actual Disbursement 12-12-2014 Grant Aid Cash No NORMAL CASE Sector Wide Approach 6,199,267 USD
Actual Disbursement 12-10-2015 Grant Aid Cash No NORMAL CASE Sector Wide Approach 3,857,094 USD
Actual Disbursement 09-08-2016 Grant Aid Cash No NORMAL CASE Sector Wide Approach 3,174,062 USD
Actual Disbursement 07-21-2019 Grant Aid Cash No NORMAL CASE Sector Wide Approach -7,028 USD
Sub Total Actual Disbursement: 50,716,008 USD
Planned Disbursement 11-25-2015 Grant Aid Cash No NORMAL CASE Sector Wide Approach 5,204,637 USD
Sub Total Planned Disbursement: 5,204,637 USD
UNDISBURSED BALANCE: 4,664,947 USD
Department for International Development
Transaction Type Transaction Date Type Of Assistance Mode Of Payment Post Earthquake Assistance Aid Type Financing Instrument Amount
Actual Commitment 09-09-2009 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 19,179,894 USD
Actual Commitment 11-28-2013 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 3,255,738 USD
Sub Total Actual Commitment: 22,435,632 USD
Sub Total Planned Commitment: 0 USD
Actual Disbursement 03-31-2010 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 6,767,032 USD
Actual Disbursement 03-31-2011 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 4,348,526 USD
Actual Disbursement 03-31-2012 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 124,876 USD
Actual Disbursement 02-26-2013 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 3,978,175 USD
Actual Disbursement 07-15-2014 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 6,585,125 USD
Sub Total Actual Disbursement: 21,803,734 USD
Planned Disbursement 12-31-2012 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 4,363,989 USD
Planned Disbursement 03-31-2014 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 6,232,169 USD
Sub Total Planned Disbursement: 10,596,158 USD
UNDISBURSED BALANCE: 631,899 USD
Expenditure 03-31-2010 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 6,767,032 USD
Asian Development Bank
Transaction Type Transaction Date Type Of Assistance Mode Of Payment Post Earthquake Assistance Aid Type Financing Instrument Amount
Actual Commitment 11-27-2009 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 70,000,000 USD
Actual Commitment 11-27-2009 Concessional Loan Assistance Reimbursable No NORMAL CASE Sector Wide Approach 25,805,086 USD
Actual Commitment 02-13-2012 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 65,000,000 USD
Sub Total Actual Commitment: 160,805,086 USD
Sub Total Planned Commitment: 0 USD
Actual Disbursement 12-31-2010 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 45,000,000 USD
Actual Disbursement 03-15-2012 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 25,000,000 USD
Actual Disbursement 07-15-2012 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 10,000,000 USD
Actual Disbursement 11-15-2013 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 35,000,000 USD
Actual Disbursement 11-15-2015 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 20,000,000 USD
Sub Total Actual Disbursement: 135,000,000 USD
Planned Disbursement 06-30-2012 Concessional Loan Assistance Reimbursable No NORMAL CASE Sector Wide Approach 25,000,000 USD
Planned Disbursement 06-30-2012 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 25,000,000 USD
Sub Total Planned Disbursement: 50,000,000 USD
UNDISBURSED BALANCE: 25,805,086 USD
Finland
Transaction Type Transaction Date Type Of Assistance Mode Of Payment Post Earthquake Assistance Aid Type Financing Instrument Amount
Actual Commitment 04-27-2010 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 21,396,095 USD
Actual Commitment 12-21-2014 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 8,745,100 USD
Sub Total Actual Commitment: 30,141,195 USD
Sub Total Planned Commitment: 0 USD
Actual Disbursement 03-31-2011 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 4,241,482 USD
Actual Disbursement 12-15-2013 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 4,808,353 USD
Actual Disbursement 06-15-2014 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 4,738,695 USD
Actual Disbursement 04-30-2015 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 5,607,500 USD
Actual Disbursement 09-14-2016 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 2,249,400 USD
Sub Total Actual Disbursement: 21,645,429 USD
Planned Disbursement 07-15-2011 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 1,950,355 USD
Planned Disbursement 07-15-2012 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 3,368,034 USD
Planned Disbursement 04-15-2015 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 2,112,800 USD
Sub Total Planned Disbursement: 7,431,189 USD
UNDISBURSED BALANCE: 8,495,766 USD
Denmark
Transaction Type Transaction Date Type Of Assistance Mode Of Payment Post Earthquake Assistance Aid Type Financing Instrument Amount
Actual Commitment 11-27-2009 Technical Assistance (Standalone) Direct Payment No NORMAL CASE Sector Wide Approach 3,449,400 USD
Actual Commitment 11-27-2009 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 34,494,004 USD
Actual Commitment 02-17-2012 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 22,588,456 USD
Sub Total Actual Commitment: 60,531,861 USD
Sub Total Planned Commitment: 0 USD
Actual Disbursement 12-09-2009 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 12,072,902 USD
Actual Disbursement 06-30-2010 Technical Assistance (Standalone) Direct Payment No NORMAL CASE Sector Wide Approach 53,769 USD
Actual Disbursement 06-30-2010 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 10,956,929 USD
Actual Disbursement 12-31-2010 Technical Assistance (Standalone) Direct Payment No NORMAL CASE Sector Wide Approach 212,707 USD
Actual Disbursement 06-30-2011 Technical Assistance (Standalone) Direct Payment No NORMAL CASE Sector Wide Approach 153,354 USD
Actual Disbursement 12-31-2011 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 9,876,757 USD
Actual Disbursement 02-29-2012 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 4,874,097 USD
Actual Disbursement 12-31-2012 Technical Assistance (Standalone) Direct Payment No NORMAL CASE Sector Wide Approach 16,262,037 USD
Actual Disbursement 07-15-2014 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 3,344,339 USD
Actual Disbursement 06-30-2015 Technical Assistance (Standalone) Direct Payment No NORMAL CASE Sector Wide Approach 394,598 USD
Sub Total Actual Disbursement: 58,201,489 USD
Planned Disbursement 12-31-2011 Technical Assistance (Standalone) Direct Payment No NORMAL CASE Sector Wide Approach 144,566 USD
Sub Total Planned Disbursement: 144,566 USD
UNDISBURSED BALANCE: 2,330,372 USD
Government of Australia
Transaction Type Transaction Date Type Of Assistance Mode Of Payment Post Earthquake Assistance Aid Type Financing Instrument Amount
Actual Commitment 05-10-2011 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 20,502,860 USD
Actual Commitment 04-15-2015 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 3,032,147 USD
Sub Total Actual Commitment: 23,535,007 USD
Sub Total Planned Commitment: 0 USD
Actual Disbursement 05-11-2011 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 3,259,098 USD
Actual Disbursement 06-07-2011 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 4,286,786 USD
Actual Disbursement 12-18-2012 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 4,219,854 USD
Actual Disbursement 08-27-2013 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 3,818,980 USD
Actual Disbursement 07-14-2015 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 2,971,359 USD
Sub Total Actual Disbursement: 18,556,078 USD
Planned Disbursement 11-01-2012 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 4,146,367 USD
Planned Disbursement 11-01-2013 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 3,784,295 USD
Sub Total Planned Disbursement: 7,930,662 USD
UNDISBURSED BALANCE: 4,978,928 USD
Japan International Cooperation Agency
Transaction Type Transaction Date Type Of Assistance Mode Of Payment Post Earthquake Assistance Aid Type Financing Instrument Amount
Actual Commitment 02-24-2012 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 12,072,356 USD
Actual Commitment 09-23-2014 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 2,761,541 USD
Actual Commitment 07-10-2015 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 2,469,248 USD
Sub Total Actual Commitment: 17,303,145 USD
Sub Total Planned Commitment: 0 USD
Actual Disbursement 06-21-2013 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 1,161,992 USD
Actual Disbursement 11-27-2013 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 1,134,322 USD
Actual Disbursement 03-18-2014 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 153,512 USD
Actual Disbursement 06-18-2014 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 2,649,037 USD
Actual Disbursement 11-18-2014 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 2,760,267 USD
Actual Disbursement 03-12-2015 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 2,488,052 USD
Actual Disbursement 11-16-2015 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 833,346 USD
Actual Disbursement 02-21-2016 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 2,654,545 USD
Sub Total Actual Disbursement: 13,835,073 USD
Planned Disbursement 03-31-2013 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 1,044,167 USD
Planned Disbursement 03-31-2014 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 4,022,694 USD
Planned Disbursement 03-31-2015 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 3,459,998 USD
Planned Disbursement 01-31-2016 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 2,477,127 USD
Planned Disbursement 03-31-2016 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 6,170 USD
Sub Total Planned Disbursement: 11,010,156 USD
UNDISBURSED BALANCE: 3,468,072 USD
International Development Association
Transaction Type Transaction Date Type Of Assistance Mode Of Payment Post Earthquake Assistance Aid Type Financing Instrument Amount
Actual Commitment 11-27-2009 Concessional Loan Assistance Reimbursable No NORMAL CASE Sector Wide Approach 73,925,830 USD
Actual Commitment 12-07-2010 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 130,000,000 USD
Actual Commitment 07-08-2013 Concessional Loan Assistance Reimbursable No NORMAL CASE Sector Wide Approach 55,000,000 USD
Actual Commitment 07-08-2013 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 45,000,000 USD
Sub Total Actual Commitment: 303,925,830 USD
Sub Total Planned Commitment: 0 USD
Actual Disbursement 06-30-2011 Concessional Loan Assistance Reimbursable No NORMAL CASE Sector Wide Approach 43,490,645 USD
Actual Disbursement 06-30-2011 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 30,015,982 USD
Actual Disbursement 06-30-2012 Concessional Loan Assistance Reimbursable No NORMAL CASE Sector Wide Approach 47,135,283 USD
Actual Disbursement 06-30-2012 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 38,000,000 USD
Actual Disbursement 06-30-2013 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 37,150,000 USD
Actual Disbursement 06-30-2013 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 34,905,422 USD
Actual Disbursement 06-30-2013 Concessional Loan Assistance Reimbursable No NORMAL CASE Sector Wide Approach 42,370,000 USD
Actual Disbursement 06-30-2014 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 37,150,000 USD
Actual Disbursement 06-30-2014 Concessional Loan Assistance Reimbursable No NORMAL CASE Sector Wide Approach 6,190,000 USD
Actual Disbursement 06-30-2014 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 37,150,000 USD
Actual Disbursement 06-30-2015 Concessional Loan Assistance Reimbursable No NORMAL CASE Sector Wide Approach 25,330,000 USD
Actual Disbursement 06-30-2015 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 8,370,000 USD
Actual Disbursement 06-30-2015 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 8,370,000 USD
Actual Disbursement 06-30-2016 Concessional Loan Assistance Reimbursable No NORMAL CASE Sector Wide Approach 17,210,000 USD
Actual Disbursement 06-30-2017 Concessional Loan Assistance Reimbursable No NORMAL CASE Sector Wide Approach -340,000 USD
Actual Disbursement 06-30-2017 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach -10,000 USD
Sub Total Actual Disbursement: 412,487,332 USD
Planned Disbursement 06-30-2012 Concessional Loan Assistance Reimbursable No NORMAL CASE Sector Wide Approach 22,878,529 USD
Planned Disbursement 06-30-2012 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 23,000,000 USD
Planned Disbursement 06-30-2013 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 29,000,000 USD
Planned Disbursement 06-30-2013 Concessional Loan Assistance Reimbursable No NORMAL CASE Sector Wide Approach 28,636,446 USD
Planned Disbursement 06-30-2014 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 47,000,000 USD
Planned Disbursement 06-30-2014 Concessional Loan Assistance Reimbursable No NORMAL CASE Sector Wide Approach 37,824,610 USD
Sub Total Planned Disbursement: 188,339,585 USD
UNDISBURSED BALANCE: -108,561,502 USD
United Nations Children's Fund
Transaction Type Transaction Date Type Of Assistance Mode Of Payment Post Earthquake Assistance Aid Type Financing Instrument Amount
Actual Commitment 01-03-2011 Grant Aid Cash No NORMAL CASE Sector Wide Approach 4,700,000 USD
Sub Total Actual Commitment: 4,700,000 USD
Sub Total Planned Commitment: 0 USD
Actual Disbursement 12-31-2012 Grant Aid Cash No NORMAL CASE Sector Wide Approach 1,000,000 USD
Actual Disbursement 12-31-2017 Grant Aid Cash No NORMAL CASE Sector Wide Approach 2,500,000 USD
Sub Total Actual Disbursement: 3,500,000 USD
Sub Total Planned Disbursement: 0 USD
UNDISBURSED BALANCE: 1,200,000 USD
Expenditure 12-31-2017 Grant Aid Cash No NORMAL CASE Sector Wide Approach 2,500,000 USD
Expenditure 12-31-2018 Grant Aid Cash No NORMAL CASE Sector Wide Approach 1,000,000 USD
World Bank Trust Funds
Transaction Type Transaction Date Type Of Assistance Mode Of Payment Post Earthquake Assistance Aid Type Financing Instrument Amount
Actual Commitment 02-22-2016 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 47,800,000 USD
Sub Total Actual Commitment: 47,800,000 USD
Sub Total Planned Commitment: 0 USD
Actual Disbursement 06-30-2014 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 14,868,989 USD
Actual Disbursement 06-30-2016 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 25,187,006 USD
Actual Disbursement 06-30-2019 Grant Aid Reimbursable No NORMAL CASE Sector Wide Approach 8,702,000 USD
Sub Total Actual Disbursement: 48,757,995 USD
Sub Total Planned Disbursement: 0 USD
UNDISBURSED BALANCE: -957,995 USD
Progress Achieved

Progress Achieved: 

 


Key Problems: 

 


Steps Taken to solve the problem: 

 


Document

Open a PDF file of the doc attached Open.